Washington Crossing Toll-Supported Bridge -- An overhead sign-structure installation and repair project is expected to begin July 7 at the Pennsylvania side of the Washington Crossing Bridge. Periodic alternating single-lane travel controlled by flaggers is scheduled 9 a.m. to 3 p.m. Thursday, July 10, and Friday, July 11.