I-78 Toll Bridge Monday, July 1, and Tuesday, July 2 -- Westbound single-lane closure (two of three lanes open) 6:30 a.m. to 3 p.m. starting before the bridge at milepost 0.8 in New Jersey. Eastbound single-lane closure (two of three lanes open) 10 a.m. to 6 p.m. after crossing bridge from Pennsylvania into New Jersey beginning at milepost 0.8 and continuing to milepost 2.4.
NEW HOPE, PA – The Delaware River Joint Toll Bridge Commission today announced a tentative July 11 opening date for a temporary walkway that will be put into service at the Hope-Lambertville [...]
NEW HOPE, PA – The Delaware River Joint Toll Bridge Commission recently hired an engineering firm to design an open-road cashless all-electronic tolling (AET) gantry slated for construction [...]