Calhoun Street Bridge -- Flagger-controlled alternating single lane travel restrictions are scheduled to be in effect 9 a.m. to 3 p.m. Monday, Nov. 17, to Friday, Nov. 21. A Commission contractor will be reinstalling replacement iron architectural brackets at various locations along the bridge's roadway deck. Brief travel delays are possible. Motorists are advised to follow flagger instructions and exercise caution.
YARDLEY, PA – The Delaware River Joint Toll Bridge Commission is mourning the recent passing of the agency’s former award-winning chief engineer, George A. Alexandridis, P.E., of Lawrenceville, [...]
STOCKTON, NJ – The Delaware River Joint Toll Bridge Commission (DRJTBC) today announced that wireless structural-monitoring sensors have been installed on the Centre Bridge-Stockton [...]