Washington Crossing Toll-Supported Bridge -- A flagger-controlled alternating single-lane travel restriction is scheduled for the Washington Crossing Bridge's Pennsylvania approach roadway 9 a.m. to 3 p.m. Monday, July 14. Motorists are urged to reduce speeds, exercise caution, and follow flagger instructions. Brief traffic stoppages are possible.
WASHINGTON CROSSING – The Delaware River Joint Toll Bridge Commission today announced that temporary travel restrictions for motorists and pedestrians will be needed to carry out an upcoming [...]
FRENCHTOWN, NJ – The rehabilitation project at the Uhlerstown-Frenchtown Toll-Supported Bridge has passed the halfway point, the Delaware River Joint Toll Bridge Commission announced today. At [...]
LAMBERTVILLE, NJ – Two videos related to the 2024-25 New Hope-Lambertville Toll-Supported Bridge Rehabilitation Project have been posted for public viewing on the Delaware River Joint Toll Bridge [...]
NEW HOPE, PA – The New Hope-Lambertville (Route 202) Toll Bridge will be reduced to single travel lanes in each direction for a multi-faceted construction project that is scheduled to get [...]