Workers have removed the deteriorated 120-year-old steel pin connection from the New Hope-Lambertville Toll-Supported Bridge’s second truss span from the PA side.
The two-week closure of the bridge remains on track to end by January 27. The bridge was shut down to all vehicular and pedestrian crossings on Monday, January 13.