Milford-Montague (Route 206) Toll Bridge -- Alternating single-lane travel is scheduled to be in effect at the Milford-Montague Toll Bridge 8 a.m. to 2 p.m. Wednesday, Aug. 27. The travel restriction will enable Commission maintenance personnel make street lighting repairs. Motorists are urged to reduce speeds, exercise caution, and allow additional time to reach their destinations. Brief traffic stoppages are possible.
  • Home
  • Newsroom
  • Job Opportunities
  • E-ZPass
  • Employee Portal
3Active Alerts
Customer Service: 1.800.363.0049
  • About
      • About the Commission
      • Commissioners
      • Management Team
      • Commission Meetings
      • Public Access – Commission Meetings
      • Commission Meeting Minutes
      • Investor Information
      • Annual Reports
      • Audit Reports
      • Operating Budget
      • Traffic Engineering Reports
      • Bridge Inspections Reports
      • Public Records Requests
      • Compact Document
      • Commission History
      • Career Opportunities
      • Newsroom
      • Other Documents
  • Bridge Info
    • Commission Bridges
    • Interactive Bridge Map
    • Bridge Load, Size & Speed Limits
    • Toll Bridges
      • Milford-Montague Toll Bridge
      • Delaware Water Gap (I-80) Toll Bridge
      • Portland-Columbia Toll Bridge
      • Easton-Phillipsburg (Rt. 22) Toll Bridge
      • I-78 Toll Bridge
      • Scudder Falls (I-295) Toll Bridge
      • New Hope-Lambertville (Rt. 202) Toll Bridge
      • Trenton-Morrisville (Rt. 1) Toll Bridge
    • Toll-Supported Bridges
      • Portland-Columbia Toll-Supported Ped. Bridge
      • Riverton-Belvidere Toll-Supported Bridge
      • Northampton Street Toll-Supported Bridge
      • Riegelsville Toll-Supported Bridge
      • Upper Black Eddy-Milford Toll-Supported Bridge
      • Uhlerstown-Frenchtown Toll-Supported Bridge
      • Lumberville-Raven Rock Toll-Supported Ped. Bridge
      • Centre Bridge-Stockton Toll-Supported Bridge
      • New Hope-Lambertville Toll-Supported Bridge
      • Washington Crossing Toll-Supported Bridge
      • Calhoun Street Toll-Supported Bridge
      • Lower Trenton Toll-Supported Bridge
    • Toll-Supported Bridge Explained
    • Traffic Counts
    • Scudder Falls Shared-Use Path Restrictions/Guidelines
    • Bridge Lights
      • ‘Trenton Makes the World Takes’ Sign Lighting
      • Northampton Street Bridge (the ‘free bridge’) Lighting
      • New Hope-Lambertville Bridge Lighting
  • Tolls & Travel
    • Current Toll Rates
    • Proposed Toll-Rate Schedule for 2026
    • Toll Customer Service
    • E-ZPass Information
    • TOLL BY PLATE
    • Toll Violations
    • Truck Permit Application
    • Active Alerts
    • Winter Travel Safety
  • Projects
    • 2025 Uhlerstown-Frenchtown Toll-Supported Bridge Rehabilitation Project
    • 2024 New Hope-Lambertville Toll-Supported Bridge Rehabilitation Project
    • Washington Crossing Bridge Alternatives Analysis
    • Northampton Street Toll-Supported Bridge Rehabilitation Project
    • Southern Operations & Maintenance Facilities Improvements – Langhorne
    • Southern Operations & Maintenance Facilities Improvements – Morrisville
    • Scudder Falls Bridge Replacement Project (completed 2022)
    • Commission Administration Building at Scudder Falls
    • Public Involvement
  • Doing Business
      • Procurement Process
      • Responsible Contractors Program
      • Contract Compliance
      • Compliance Performance Reports
      • Professional Services
        • Procurement Process Guidelines
        • Upcoming Procurements
        • Current Procurements
        • Consultant Contract Awards
      • Construction Services
        • Notice To Contractors
        • Bid Results
        • Awarded Bids
      • Purchases and Other Procurements
        • Procurements of Commodities, Materials & Supplies
        • Bids for Maintenance Services & Materials
  • Contact
Delaware River Joint Toll Bridge Commission Delaware River Joint Toll Bridge Commission Delaware River Joint Toll Bridge Commission Delaware River Joint Toll Bridge Commission
  • About
    • –
      • About the Commission
      • Commissioners
      • Management Team
      • Commission Meetings
      • Public Access – Commission Meetings
      • Commission Meeting Minutes
    • –
      • Investor Information
      • Annual Reports
      • Audit Reports
      • Operating Budget
      • Traffic Engineering Reports
      • Bridge Inspections Reports
    • –
      • Public Records Requests
      • Compact Document
      • Commission History
      • Career Opportunities
      • Newsroom
      • Other Documents
  • Bridge Info
    • Commission Bridges
    • Interactive Bridge Map
    • Bridge Load, Size & Speed Limits
    • Toll Bridges
      • Milford-Montague Toll Bridge
      • Delaware Water Gap (I-80) Toll Bridge
      • Portland-Columbia Toll Bridge
      • Easton-Phillipsburg (Rt. 22) Toll Bridge
      • I-78 Toll Bridge
      • Scudder Falls (I-295) Toll Bridge
      • New Hope-Lambertville (Rt. 202) Toll Bridge
      • Trenton-Morrisville (Rt. 1) Toll Bridge
    • Toll-Supported Bridges
      • Portland-Columbia Toll-Supported Ped. Bridge
      • Riverton-Belvidere Toll-Supported Bridge
      • Northampton Street Toll-Supported Bridge
      • Riegelsville Toll-Supported Bridge
      • Upper Black Eddy-Milford Toll-Supported Bridge
      • Uhlerstown-Frenchtown Toll-Supported Bridge
      • Lumberville-Raven Rock Toll-Supported Ped. Bridge
      • Centre Bridge-Stockton Toll-Supported Bridge
      • New Hope-Lambertville Toll-Supported Bridge
      • Washington Crossing Toll-Supported Bridge
      • Calhoun Street Toll-Supported Bridge
      • Lower Trenton Toll-Supported Bridge
    • Toll-Supported Bridge Explained
    • Traffic Counts
    • Scudder Falls Shared-Use Path Restrictions/Guidelines
    • Bridge Lights
      • ‘Trenton Makes the World Takes’ Sign Lighting
      • Northampton Street Bridge (the ‘free bridge’) Lighting
      • New Hope-Lambertville Bridge Lighting
  • Tolls & Travel
    • Current Toll Rates
    • Proposed Toll-Rate Schedule for 2026
    • Toll Customer Service
    • E-ZPass Information
    • TOLL BY PLATE
    • Toll Violations
    • Truck Permit Application
    • Active Alerts
    • Winter Travel Safety
  • Projects
    • 2025 Uhlerstown-Frenchtown Toll-Supported Bridge Rehabilitation Project
    • 2024 New Hope-Lambertville Toll-Supported Bridge Rehabilitation Project
    • Washington Crossing Bridge Alternatives Analysis
    • Northampton Street Toll-Supported Bridge Rehabilitation Project
    • Southern Operations & Maintenance Facilities Improvements – Langhorne
    • Southern Operations & Maintenance Facilities Improvements – Morrisville
    • Scudder Falls Bridge Replacement Project (completed 2022)
    • Commission Administration Building at Scudder Falls
    • Public Involvement
  • Doing Business
    • –
      • Procurement Process
      • Responsible Contractors Program
      • Contract Compliance
      • Compliance Performance Reports
    • –
      • Professional Services
        • Procurement Process Guidelines
        • Upcoming Procurements
        • Current Procurements
        • Consultant Contract Awards
    • –
      • Construction Services
        • Notice To Contractors
        • Bid Results
        • Awarded Bids
    • –
      • Purchases and Other Procurements
        • Procurements of Commodities, Materials & Supplies
        • Bids for Maintenance Services & Materials
  • Contact
Home /

News Releases

Monthly Archive for: "November, 2024"
Home /
Nov
27
News Release
November 27, 2024

New Hope-Lambertville Toll-Supported Bridge’s New Walkway to Reopen This Afternoon (Wednesday, Nov. 27)

LAMBERTVILLE, NJ – The New Hope-Lambertville Toll-Supported Bridge’s new pedestrian walkway is expected to reopen this afternoon, the Delaware River Joint Toll Bridge Commission announced today. [...]

READ MORE
Nov
27
News Release
November 27, 2024

New Hope-Lambertville Toll-Supported Bridge’s New Walkway to Reopen This Afternoon (Wednesday, Nov. 27)

LAMBERTVILLE, NJ – The New Hope-Lambertville Toll-Supported Bridge’s new pedestrian walkway is expected to reopen this afternoon, the Delaware River Joint Toll Bridge Commission announced today. [...]

READ MORE
Nov
25
News Release
November 25, 2024

Two-Week Shutdown of New Hope-Lambertville Bridge Expected to Begin January 13

NEW HOPE, PA – The Delaware River Joint Toll Bridge Commission today announced a January 13, 2025 starting date for a full two-week-long shutdown of the New Hope-Lambertville Toll-Supported [...]

READ MORE
Nov
15
News Release
November 15, 2024

REMINDER: Full Vehicular-Traffic Closures Scheduled at New Hope-Lambertville Bridge During Overnight Periods Monday through Thursday, Nov. 18-21

NEW HOPE, PA – The New Hope-Lambertville Toll-Supported Bridge remains scheduled to be fully closed to  vehicular traffic in both directions 10 p.m. to 6 a.m. (next day) on the nights of Monday, [...]

READ MORE
Nov
12
News Release
November 12, 2024

New Hope-Lambertville Bridge Scheduled to be Closed to All Vehicular Traffic During Overnight Periods November 18 to 21

NEW HOPE, PA – The New Hope-Lambertville Toll-Supported Bridge is scheduled to be closed to all vehicular traffic during overnight hours – 10 p.m. to 6 a.m. – on the nights of Tuesday, Nov. 18, [...]

READ MORE
Quick Links
  • Bridge Load, Size & Speed Limits
  • Traffic Counts
  • Annual Reports
  • Audits & Financial Statements
Info For…
  • Motorists
  • Contractors/Consultants
  • Investors
  • Job Seekers
  • Commission Meetings
  • Documents
Toll-Free Numbers
Customer Service: 1-800-363-0049
E-ZPass Customer Service/Violations Procession Center: 1-888-AUTO-TOLL
(1-888-288-6865)
Copyright © Delaware River Joint Toll Bridge Commission
  • Home
  • Employee Portal
  • Newsroom
  • Contact
  • Privacy Policy
  • Site Map