Oversized vehicles exceeding one or more of the following criteria will not receive a permit to cross the Scudder Falls Bridge during 4-1/2-year-long Scudder Falls Bridge Replacement Project:
- Gross vehicle weight (GVW) over 201,000 pounds
- Greater than 10 feet in width
- Greater than 80 feet in length